1, 15 tons coal boiler Vietnam chimney height: boiler room chimney height requirements is the fact that each new boiler room is allowed to set up only one chimney, boiler room chimney relating with the minimum allowable height (GB 13271-2001) execution.
2, the revolutionary production and installing the boiler should install efficient desulfurization and efficient dust removal facilities; in-use coal boiler should accomplish efficient desulfurization of flue gas, de-dust transformation, and actively carry out technical transformation of low-nitrogen combustion, achieve full discharge towards the environmental standards.
3, dust removal equipment: 15 ton coal-fired boiler fuel from the combustion process will make a wide range of flue gas (gas combination of solid material and material), will plug the boiler, it takes de-dusting. Common mechanical boiler precipitator dust removal equipment are Cottrell precipitator, filter dust, scrubbers.
4, desulfurization and denitrification configuration: serious pollution produces during coal combustion, such as CO2 in flue gas is often a greenhouse gas, SOx can result in the formation of acid rain, NOX Acid precipitation is brought on by one of the culprits, and so people should install desulphurization and denitration equipment in coal fired steam boilers.
ZG boiler as the leading boiler manufacturer in coal fired boiler field will provide top quality boiler, professional installation and maintenance service for the clients.
more project http://www.zgindustrialboiler.com/project/4t-Chain-Grate-Boiler-Exported-to-Kazakhs.html
没有评论:
发表评论